I'm sort of new around here, been lurking for awhile though.

This summer I plan to do some yard work, some of which will include moving one of our dog kennels. It's currently on the patio near the pool...not good. Being we have huskies that like to dig, it's going to need to be on a hard surface. I'm very good with most diy projects and am generaly quick at picking up new skills. I understand the basics of pouring a slab. Being as cheap as I am and for the intended purpose...this is something I'd like to try to do myself. The kennel is 12'x12' so the pad would need to be atleast that big if not slightly bigger. Is this something I could possibly do myself? Anyone have some tips or advice before I dive into this.
 
To avoid these ads, REGISTER NOW!

Frank The Plumber

Well-known member
Joined
Feb 19, 2011
Messages
2,644
Location
Chicago.
How do you feel after you run as fast as you can for like 6 miles? If the answer is " like I'm gonna drop dead" Hire some one.
 

Toolfool

Well-known member
Joined
Aug 22, 2011
Messages
4,991
Location
Columbus, Ohio
If you're going to use pre-mix bags, good luck. If you're going to have concrete delivered, you have a chance. Do it before the weather gets warmer.
 

Falcon67

Well-known member
Joined
Jun 11, 2009
Messages
18,371
Location
Merkel, TX
12x12 should be some work, but not impossible. Try to find a house build that is about to get poured and go watch. Ask the concrete company, they will probably share a date and location. After that, make your call. With a good size float, 12 x 12 will still need at least two to screed with any hope of staying level. If you decide to try it, make dang sure you have everything ready for the delivery - forms all set, tools, screed board, a plan, etc. Concrete waits for no one, period.

I thought about trying to round up folks for a concrete party. Then I watched 92 yards poured for the house next door. I called and got bids the next day.
 

930dreamer

Super Moderator
Staff member
Joined
Oct 7, 2009
Messages
23,077
Location
Amarillo,TX and Stinnett,TX
If you have a redi-mix place at your local rental center call and check the size of their concrete trailer. They can help with the math also, might have to do it in two pours. I've done a basketball court and a kennel, not easy work but very satisfying when it's all finished.:D Great time to cook out when it's all said and done.
 

wef

Active member
Joined
Apr 1, 2012
Messages
26
Location
Southern Maryland
It is very doable with someone to help with the screeding. 930dreamer's advice about the concrete trailer is the best way to go. You won't need enough concrete for a minimum load so if you did get a redimix truck, the price per yard would be through the roof.
 

supernova

Well-known member
Joined
Mar 13, 2012
Messages
76
I poured my first slab last year, a 9' x 9' slab for my hot tub. I called in a truck, I think it was 2.5 yards total (i put some piers in it to the frost line) and it went pretty well, just me, my wife & a friend wheel narrowing it from the curb to the backyard. Definitely have everything lined up & ready to go. I got a cool delivery guy that helped out quite a bit, made it a little wetter so I could work it a little longer. But definitely gratifying to have done it yourself & learned another trick along the way. I say go for it & good luck!!:thumbup:

Sent from my Inspire 4G using tapatalk
 
To avoid these ads, REGISTER NOW!

pauls340

Well-known member
Joined
Jan 27, 2009
Messages
321
Location
North of Motown
A cu yd of concrete does 81 sq ft 4" thick...you have less than 2 yds. I think we paid $150 a yd + $75 delivery (only 5 miles away) last time we got a short load.
 
Last edited:
OP
T

toomany

Well-known member
Joined
Feb 11, 2010
Messages
99
Location
Auburn, Mi
Thanks for the replies everyone.

I do know someone in the business, guess I'll give them a call. So it's looking like my best bet will be to get the area prepared then have the mix delivered. I'll update the thread as I go. I still have to move some of the wood pile before I can get much further.
 

1jjpop

Well-known member
Joined
Nov 24, 2009
Messages
481
Location
Central Iowa
If you are going to get help , get people that know something , that has been around pouring concrete . I have been asked before to help pour , I showed up and the rest of the help says what do I do. and I end up working my self to death to save the pour .The number of help doesn't count much if they don't know anything.
 

Cabby89

Well-known member
Joined
Nov 18, 2009
Messages
50
This is totally doable with some help, a mixer and time. I recently poured a 10'x12'x 5" and 12'x13'x4" rooms in a basement flat. Both were done using a HF 2.5cuft mixer which would mix 2 60lb premix bags at a time. I was also able to rent the Home Depot truck for free because I was buying an entire pallet of mix. Which means all I had to do was unload it into my house. Screeding was not difficult but because of the size helps to have 2 people doing it.

Though I will say that if you can get a ready mix company to deliver the 1-2yd at a decent rate that is much easier to do. They normally want to deliver a minimum of 3yd so the price may be a bit high.
 
To avoid these ads, REGISTER NOW!