Good morning,
I'm soon building a shed that I want to power. I'm not a builder nor electrician, but I feel like I should be able to do this myself, however I'm having some trouble coming up with the know-how. I already have zoning and building permits.
I want to run power to the 12x20 shed from the main panel in my house. The shed is about 100' away from the panel. I was thinking of putting a 60A subpanel in the shed to power things like lights, refrigerator, tv, maybe a mini split, basic power tools (saws/shop vac). I understand to do this I need to run four 4AWG individual conductors in conduit buried 18". I have seen/heard a special threaded or waterproof fitting is needed for buried conduit(?)
I'm going to put the shed on a packed gravel base. What I haven't found online yet is anyone pre-running the conduit prior to building the base so that the conduit comes up into the building from beneath rather than running over the top of the gravel.
Here are my questions:
Is it okay to pre-run the conduit, then pack gravel around it? If so do I need sch80 PVC for the areas where the conduit is less than 18"/above grade, and can use sch40 buried? Is 1" conduit the correct size? Do I need special fittings or can I just glue it together? I'm in WI using 2017 NEC.
Thank you!!!
I'm soon building a shed that I want to power. I'm not a builder nor electrician, but I feel like I should be able to do this myself, however I'm having some trouble coming up with the know-how. I already have zoning and building permits.
I want to run power to the 12x20 shed from the main panel in my house. The shed is about 100' away from the panel. I was thinking of putting a 60A subpanel in the shed to power things like lights, refrigerator, tv, maybe a mini split, basic power tools (saws/shop vac). I understand to do this I need to run four 4AWG individual conductors in conduit buried 18". I have seen/heard a special threaded or waterproof fitting is needed for buried conduit(?)
I'm going to put the shed on a packed gravel base. What I haven't found online yet is anyone pre-running the conduit prior to building the base so that the conduit comes up into the building from beneath rather than running over the top of the gravel.
Here are my questions:
Is it okay to pre-run the conduit, then pack gravel around it? If so do I need sch80 PVC for the areas where the conduit is less than 18"/above grade, and can use sch40 buried? Is 1" conduit the correct size? Do I need special fittings or can I just glue it together? I'm in WI using 2017 NEC.
Thank you!!!