Rigpig
Well-known member
Hi, i'm getting ready to pour the slab for the shop in a few days and wanted some feedback from those that have 2-post lifts in their shops. I've decided on the right side, but was wondering if should stuff it near the back with a couple feet from the front to get around a vehicle, or near the front of the shop for ease of access and it leaves room at the back for other stuff?? Post up what you've done, or if you'd change what you have. I'm also thinking of having about a 2-foot wide footprint, 8"thick concrete where the hoist will stand.
What are your thoughts?
Thanks.
PS:this is a shot of the front with forms removed etc... dimensions are 30'X36'deep, 2x 10' doors, 14'walls.
What are your thoughts?
Thanks.
PS:this is a shot of the front with forms removed etc... dimensions are 30'X36'deep, 2x 10' doors, 14'walls.
Attachments
Last edited: