I'm planning on putting down Legacy SD epoxy in my garage and decided to grind as part of the prep. I rented a 10" diamond grinder and started going at it. The floor is new - poured about 3 months ago and it looks like the builder put a leveling compound down. This is probably a stupid question, but how much grinding is needed? I don't think I should be grinding until the leveling compound has been removed, but I figured I'd ask before getting too far along.
Thanks!
Matt
Thanks!
Matt

