tinmanwpk
Well-known member
In preparation for a new garage slab I have a stump about 36" diameter right where i want my slab. Can I burn it down to 12" - 18" below grade and have the site prepped with the remainder of the stump in place, or should I have a backhoe just tear it all out?
