So I've read a bunch of threads on concrete here and on other sites, but I'm still left with some questions. Could anyone please help me?
I have some very basic questions about re-doing the concrete on my garage floor. It was probably done in the 1950s/1960s, the garage measures approx. 20'x20'. The concrete looks pretty aggregate-heavy, and is starting to crack and crumble in some spots. It seems to have been poured as two separate pours, as opposed to one big pour with relief cuts.
Anyway, right now I'm just trying to run the numbers to see what it would cost to re-do the concrete. I would try and do all the prep myself (up to and perhaps including the forms), and then have someone come and pour it & finish it.
* Does my soil and water determine whether or not to use a vapor barrier, or are they always good practice?
* Does my plan to heat the garage determine whether or not to use rigid foam insulation underneath, or something else?
* Is 3"-4" of gravel/stone underneath sufficient for a typical pad pour?
* What determines whether or not my pad needs footers around the perimeter?
My ultimate plan is to epoxy the floor, so I think that means "yes" to a vapor barrier. But I don't know about the gravel/stone question, or even what kind of gravel/stone to use.
I have some very basic questions about re-doing the concrete on my garage floor. It was probably done in the 1950s/1960s, the garage measures approx. 20'x20'. The concrete looks pretty aggregate-heavy, and is starting to crack and crumble in some spots. It seems to have been poured as two separate pours, as opposed to one big pour with relief cuts.
Anyway, right now I'm just trying to run the numbers to see what it would cost to re-do the concrete. I would try and do all the prep myself (up to and perhaps including the forms), and then have someone come and pour it & finish it.
* Does my soil and water determine whether or not to use a vapor barrier, or are they always good practice?
* Does my plan to heat the garage determine whether or not to use rigid foam insulation underneath, or something else?
* Is 3"-4" of gravel/stone underneath sufficient for a typical pad pour?
* What determines whether or not my pad needs footers around the perimeter?
My ultimate plan is to epoxy the floor, so I think that means "yes" to a vapor barrier. But I don't know about the gravel/stone question, or even what kind of gravel/stone to use.