I'm getting ready to do some trenching to get electricity and water to my barn. I will require 2 ~100' trenches. While I have the trencher, I'm considering a 3rd trench for a drain tile from one of my downspouts. This will require another 100' or so and I'm wondering if this is too much to do in one weekend. The ground is pretty hard in places, the electric and drainage trenches will cross the gravel driveway, and I have a couple trees to go around. The ground isn't too rocky (except for the drive). What do you think, is this a reasonable weekend project maybe spilling into the next week to backfill?