I am ready to prime, epoxy and urethane top coat with Legacy Flooring products and I have question regarding the timing. I have read the instructions regarding tack free timing and recoat times but what is too much time between coats? With the local forecast, I may not be able to get all three layers down in the next 48 hours.
Can any of these layers wait several days between the next coat? I can probably get the primer down today but the epoxy and topcoat may have to wait several days. Is this a problem?