To avoid these ads, REGISTER NOW!

primer, epoxy and urethane timing questions

djm999

Well-known member
Joined
Dec 27, 2009
Messages
101
Location
W. Pennsylvania
I am ready to prime, epoxy and urethane top coat with Legacy Flooring products and I have question regarding the timing. I have read the instructions regarding tack free timing and recoat times but what is too much time between coats? With the local forecast, I may not be able to get all three layers down in the next 48 hours.

Can any of these layers wait several days between the next coat? I can probably get the primer down today but the epoxy and topcoat may have to wait several days. Is this a problem?
 
To avoid these ads, REGISTER NOW!

LegacyIndustrial

ALLIANCE MEMBER
Joined
Jun 7, 2010
Messages
7,994
Location
deerfield, IL
You will have to scuff it, wipe with denatured alcohol, prior to next coat .

Use a lint free rag/towel for the wipe.


Sent from my iPhone using Tapatalk
 
OP
D

djm999

Well-known member
Joined
Dec 27, 2009
Messages
101
Location
W. Pennsylvania
Thanks Scotty

What is the maximum window of time between before scuffing is necessary:

Primer to epoxy
Epoxy to urethane
 
To avoid these ads, REGISTER NOW!
To avoid these ads, REGISTER NOW!
Top Bottom