Here are some photos of our www.prep-crete.com Installation Company pouring 60,000 square feet of finished floors in Brooklyn NY new apartment building of self leveling underlayment and then micro topping with a polishable topping and then sealing. The floors need a total of about 17 steps to achieve the desired specified result.
You’ll notice in one of the photos the orange marks with height pins set by our lasers so we know how much to pour in each area since the floor needs to be dead level and the rough masons can’t hold tolerances often. Pea gravel was used as a filler and to slow the progress of the leveler and keep it where it belongs. This project had heights of from almost zero to about 2” of variations to get level. Complicated work and only one shot to get it right!
The other photos show the prepped floors with epoxy and sand broadcast for bonding and the machine pump mixing the material for pumping onto the floor.
One of the areas is completed for the Sales Office. Customer very happy. All in a days work.
You’ll notice in one of the photos the orange marks with height pins set by our lasers so we know how much to pour in each area since the floor needs to be dead level and the rough masons can’t hold tolerances often. Pea gravel was used as a filler and to slow the progress of the leveler and keep it where it belongs. This project had heights of from almost zero to about 2” of variations to get level. Complicated work and only one shot to get it right!
The other photos show the prepped floors with epoxy and sand broadcast for bonding and the machine pump mixing the material for pumping onto the floor.
One of the areas is completed for the Sales Office. Customer very happy. All in a days work.