trbomax
Well-known member
As stated in another post,the wifes 14 x 32 is almost done. Ive installed a Goodman 95% dual stage furnace ratede at 40k. It will heat her shop and my 14 x 32 machine shop area as well. The plan is to keep it at 45 when we are not there,and run it up to 70 a few hrs a day when we are. Cielings are r 70,walls r-40,and its tight,every penetration is sealed.The problem is ,I'm not done outside around the building so setting a pig now would mean moveing it later,changeing the line too. I'm wondering how long this rig might run on a 100# cyl ?, then finish it up next summer corectly. Would I be changeing them every week? That would be a PIA and wont fly.