Snip
Well-known member
Shell is up and concrete poured friday 40x66x14. Still a little down the road but pro active thinking about heat. Tennessee along I40 just West of the central/eastern time line. Mild winters compared to where I moved from (Denver). I have a NG 100k Btu radiant tube heater i'm going to install. Meter is 225 feet from the shop and gas company will only allow 1 meter per address. Gas company will trench, run line and risers as needed for 5.00 a foot, adds up fast. Other options are trench and install line myself( if allowed) have them make hookups. Other option wold be to convert the heater (reznor) to Propane and install a tank. What are your thoughts on these options?