2leftthumbs
Member
- Joined
- May 14, 2011
- Messages
- 5
I'm installing a subpanel in a detached garage. Individual conductors in 2" PVC conduit. The shortest path would be from main panel into crawl space, then exiting building through LB
under a deck built on grade. My question is - Does conduit need to be buried while under the deck? If so,I imagine at the same 18" minimum cover as remainder of run. I live in WA. ST. Thanks for any input or feedback
under a deck built on grade. My question is - Does conduit need to be buried while under the deck? If so,I imagine at the same 18" minimum cover as remainder of run. I live in WA. ST. Thanks for any input or feedback