Jawgarage
Well-known member
Quick question thinking ahead.... is it to CODE to run say an empty 4" and two 2" PVC pipes and elbows from the outside underground then through the lower block wall near the footing and up into where the slab will be poured and cap them off for future use? I have no plumbing in my garage build plans but am thinking it might be good to put some empty pipe in there now. Does this make sense or introduce problems and Id be better off plumbing later if I need to through the framed walls?