Not sure where else this should be posted but I figured here is good because technically it includes a garage in the addition lol. Anyways so here is my question. I've been remodeling (completely gutted and redoing everything) a house im going to move into eventually. I'm getting close with the existing house, but there are additions I want to do, both out as well as up (only on the new construction will there be a 2nd story, not messing with existing roof)
My question is, when I add my front attached garage, kitchen (old kitchen was turned into something else) as well as the living room area (original also turned into something else), can I have the first story additions built so I can get the first story (drywall texture floor etc) wrapped up and done, then do the second story later on (as much as maybe 6 months after)? Main reason is money really, a relative is going to give me a loan but and I dont want to really borrow TOO much, id be good with just getting the first story (block) built and closed up.
My main question about this I guess is the roof. Obviously I'm not going to finish it and put shingles only to tear it off 6 months after. Can a flat roof of some sort that the second story (frame) can be continued off of, yet be water proof? Not really concerned with it not being insulated well etc, because at this point im still going to be working on it and not living there yet.
I figured there are builders on here that can assist me. I tried searching google but I really don't know what to type in to search because this is kind of long lol.
As far as permits go, I can just pull the permits for everything (plans are being drawn as we speak), so I can just leave the permits active until im all finished.
My question is, when I add my front attached garage, kitchen (old kitchen was turned into something else) as well as the living room area (original also turned into something else), can I have the first story additions built so I can get the first story (drywall texture floor etc) wrapped up and done, then do the second story later on (as much as maybe 6 months after)? Main reason is money really, a relative is going to give me a loan but and I dont want to really borrow TOO much, id be good with just getting the first story (block) built and closed up.
My main question about this I guess is the roof. Obviously I'm not going to finish it and put shingles only to tear it off 6 months after. Can a flat roof of some sort that the second story (frame) can be continued off of, yet be water proof? Not really concerned with it not being insulated well etc, because at this point im still going to be working on it and not living there yet.
I figured there are builders on here that can assist me. I tried searching google but I really don't know what to type in to search because this is kind of long lol.
As far as permits go, I can just pull the permits for everything (plans are being drawn as we speak), so I can just leave the permits active until im all finished.