I can't seem to find anything actually specifying what is acceptable between the meter base/disconnect to the panel. Was wondering if THHN is acceptable, or if I need to use SER. I'd prefer to run 3/0 THHN, but can't find anything saying it is acceptable.
Some more info.
Some more info.
- 200A meter base/Disconnect
- 200A panel
- 200A panel will literally be on the inside of the wall where the Meter base/Disconnect is.

