I finally finished my ceiling and started installing my new ballasts in my lights. Now I am ready to move on to the installation. I have 8' 4 bulb t8 fixtures. I am going to run 3 rows of 3. And I would like to but them up against each other and run the wire inside. I would like to also put 6 on 1 switch and 3 on another. I plan on screwing 2x4s across the trusses and then screwing the light to them. I have a roll of mc 12/2 that I am going to use for the runs and then use some romex or something inside to connect them all. Also read about feedinf the fixture not the switch, but having a hard time picturing all this. Can someone verify this all will work and how to do it?