73survivor
Member
I have a 12 x 24 garage that the concrete floor slopes to one side and I would like to put a drain in the middle of the floor so I can wash cars in the winter. I want to pour a new floor so the water runs to the middle. This is my question: Can I pour 4" of concrete on top of the existing slab without putting any stone down first? Do I need to tie in with the existing slab with rebar? Ceiling height is not an issue and I don't really want to dig the existing floor up, just pour on top of it. Any suggestions are welcome. Thanks
