When starting a job like a basement renovation/finishing, do you ask for some payment up front and what kind of rule of thumb do you use?
I'm getting my basement done (4 year old home) and I've done quite a bit of reading and the consensus from homeowners and advisers seem to be:
1. Pay a maximum of 10% up front OR
2. Pay nothing up front and pay on a 'work done' basis. E.g. one payment with framing complete, another payment when electrical is complete
3. Buy the materials yourself and fore go the volume discount your contractor might have gotten. If your contractor asks you for the cost of material up front, it means he/she doesn't have credit and that in itself is a warning sign OR
4. Pay for the materials only when they are delivered to your house.
I've had 3 quotes this week. One guy wanted to buy the materials and said I would pay for them on delivery and he wanted an additional $1,200 up front before he started work. That would cover framing and electrical. Water would be the week after. Total cost of framing, electrical, water, drywall is $6500 (not inc. material)
The next guy said he is OK with me buying the material based on a list he would give me. I would need to budget another $500 for 'misc' costs that may crop up during the work which I'm fine with. He wants $500 up front, before he does work and that will cover framing. Total cost of framing, electrical, water, drywall is $8000 (not inc. material)
The last guy also is fine with me buying material and paying him on delivery. He wants me to pay him at the end of the day in cash. The amount would be figured on a schedule beforehand. Total cost of framing, electrical, water, drywall is $6000 (not inc. material)
I accidentally mentioned the first quote to the last guy - I was hoping not to let them know of each quotes because I don't want a bidding war. I just want them to let me know based on their experience and estimate but the last guy kinda pondered and then said $6k and I got the impression he was gonna give me a higher one so that puts him out of the running unfortunately - just got a bad feeling.
From the 3 contractors so far, I haven't 'clicked' with any of them so far. I think it's because I've read enough horror stories that I'm just paranoid about being ripped off so when someone is overly friendly, it makes me think they are not genuine. Messed up, I know on my part
I let all three know that my preference is to purchase the materials myself (or pay them only once it's delivered) and pay after each piece of work is done. With the exception of the 3rd guy, none of them liked that plan. They both said, "Well what if we do the work and you don't pay? I'm out of pocket".
I get it from their perspective, but at the same time, they know where I live - I'm not going anywhere. I could pay them $500 / $1200 and never see them again. In the grand scheme of things, maybe $500 would not be the end of the world but $1200 would surely hurt and yet even the principle of losing $500 would hurt.
What I haven't read/heard is from the contractors perspective so I'd be interested in knowing your thoughts on all this.
When starting a job like a basement renovation/finishing, do you ask for some payment up front and what kind of rule of thumb do you use?
I'm getting my basement done (4 year old home) and I've done quite a bit of reading and the consensus from homeowners and advisers seem to be:
1. Pay a maximum of 10% up front OR
2. Pay nothing up front and pay on a 'work done' basis. E.g. one payment with framing complete, another payment when electrical is complete
3. Buy the materials yourself and fore go the volume discount your contractor might have gotten. If your contractor asks you for the cost of material up front, it means he/she doesn't have credit and that in itself is a warning sign OR
4. Pay for the materials only when they are delivered to your house.
I've had 3 quotes this week. One guy wanted to buy the materials and said I would pay for them on delivery and he wanted an additional $1,200 up front before he started work. That would cover framing and electrical. Water would be the week after. Total cost of framing, electrical, water, drywall is $6500 (not inc. material)
The next guy said he is OK with me buying the material based on a list he would give me. I would need to budget another $500 for 'misc' costs that may crop up during the work which I'm fine with. He wants $500 up front, before he does work and that will cover framing. Total cost of framing, electrical, water, drywall is $8000 (not inc. material)
The last guy also is fine with me buying material and paying him on delivery. He wants me to pay him at the end of the day in cash. The amount would be figured on a schedule beforehand. Total cost of framing, electrical, water, drywall is $6000 (not inc. material)
I accidentally mentioned the first quote to the last guy - I was hoping not to let them know of each quotes because I don't want a bidding war. I just want them to let me know based on their experience and estimate but the last guy kinda pondered and then said $6k and I got the impression he was gonna give me a higher one so that puts him out of the running unfortunately - just got a bad feeling.
From the 3 contractors so far, I haven't 'clicked' with any of them so far. I think it's because I've read enough horror stories that I'm just paranoid about being ripped off so when someone is overly friendly, it makes me think they are not genuine. Messed up, I know on my part
I let all three know that my preference is to purchase the materials myself (or pay them only once it's delivered) and pay after each piece of work is done. With the exception of the 3rd guy, none of them liked that plan. They both said, "Well what if we do the work and you don't pay? I'm out of pocket".
I get it from their perspective, but at the same time, they know where I live - I'm not going anywhere. I could pay them $500 / $1200 and never see them again. In the grand scheme of things, maybe $500 would not be the end of the world but $1200 would surely hurt and yet even the principle of losing $500 would hurt.
What I haven't read/heard is from the contractors perspective so I'd be interested in knowing your thoughts on all this.