My Sis and BIL are having a home built near me. Before the slab went down the boys put the pipes for the water lines in the wrong spot (only missed by 18” or so). By the original design, the pipe was supposed to come up under a stairway and below the third or fourth step. These folks put it under the first step. I’ve been watching the build (Sis is in Tampa) to see what the fix would be. I’m not real keen on what they did. They stuck in a 2x4 to push the pex lines away from the steps at a pretty nice angle. I’m not sure how sturdy pex is, but I’m concerned about the long term effects. I did get them to put in an access door behind the steps so the pipes can be reached if they do leak.
My question is whether this is ok or should I have them press for better work. Personally I would’ve had them open the slab and put the pipes in the correct spot.
I hope the pics come out for ya.




Last one is from behind and under the stairs.
My question is whether this is ok or should I have them press for better work. Personally I would’ve had them open the slab and put the pipes in the correct spot.
I hope the pics come out for ya.




Last one is from behind and under the stairs.