I have run a 3/4" EMT conduit from my main service panel to the mezanine area of my shed. The run is approx 60 ft to a large juction box. At the juction box conduits will go in several directions.
I will be running 3 #10 STR, 1 ea black, red and green and most likely 8 #12 THHN conductors of various colors.
Do I also need a green #12 wire between the main panel and the juction box if I am already running the #10 green wire?
I will be running 3 #10 STR, 1 ea black, red and green and most likely 8 #12 THHN conductors of various colors.
Do I also need a green #12 wire between the main panel and the juction box if I am already running the #10 green wire?
That would be a neat trick.