Hi everyone,
I am breaking up a space to put in a shop space and couple storage rooms. It is an old building so the walls are stone and columns are made of brick. I want to run a circuit from the new sub-panel. I have not put the walls up yet but want to get the basic electrical in because the electricain doing the upstairs space said he would terminate all the wiring for me in the panel, if I put in all the boxes and pulled the wire.
Basically I want a light, a switch and a couple outlets in each room. Seems pretty straight forward, but for the moment I need to mount the switch and the first outlet on one of the brick columns. When I get the partitioning walls up I will add the other outlets. Since they are exposed I was going to use metal boxes and conduit.
My question is should I pull the cable from the subpanel to the light box in the ceiling then go down to the switch then to the outlet....or should it go to the outlet first and then back up to the switch and light.? I want to try and minimize the amount of conduit but I'm not sure for example if you can "pass through" the light switch box to go down to the outlet(s)
I am breaking up a space to put in a shop space and couple storage rooms. It is an old building so the walls are stone and columns are made of brick. I want to run a circuit from the new sub-panel. I have not put the walls up yet but want to get the basic electrical in because the electricain doing the upstairs space said he would terminate all the wiring for me in the panel, if I put in all the boxes and pulled the wire.
Basically I want a light, a switch and a couple outlets in each room. Seems pretty straight forward, but for the moment I need to mount the switch and the first outlet on one of the brick columns. When I get the partitioning walls up I will add the other outlets. Since they are exposed I was going to use metal boxes and conduit.
My question is should I pull the cable from the subpanel to the light box in the ceiling then go down to the switch then to the outlet....or should it go to the outlet first and then back up to the switch and light.? I want to try and minimize the amount of conduit but I'm not sure for example if you can "pass through" the light switch box to go down to the outlet(s)