b-boy
Well-known member
I'm finishing up insulation on my pole barn walls this weekend. I have 2" foam board and unfaced fiberglass batts for the walls. My walls will be R22.
After I finish running electrical, I'd like to do the ceiling. I plan on doing blown-in cellulose or fiberglass, in the ceiling. I won't be using it for storage.
I have galvanized steel panels for the ceiling. I will add a plastic 6-mil vapor barrier to the joists as well.
My questions are:
After I finish running electrical, I'd like to do the ceiling. I plan on doing blown-in cellulose or fiberglass, in the ceiling. I won't be using it for storage.
I have galvanized steel panels for the ceiling. I will add a plastic 6-mil vapor barrier to the joists as well.
My questions are:
- How do I prep the ceiling for this?
- What access do I need to leave for the installation?
- Do I need to leave multiple panels open for access or do I just leave 1 panel and attempt to walk the rafters? They're 4 feet apart, so I'd rather not do this.
- Is it standard practice to leave a permanent access point into the attic area? How do most people insulate this access point?
Last edited:
