Hey guys, got a few questions for you all before I do my floor with the Rustoleum professional epoxy (I didn’t go 100% solids because of cost and I am somewhat flipping the house in a year or two.) For the background on the house, it was built in 1975, so the slab is 40+ years old, but is very smooth in the garage and crack free.
So for my prep I’ve got heavy duty degreaser and TSP to clean the floor. Should I do one particular one before the other?
I know one of the tests to see if the floor is free of oil and other matter is to drop water on it and see if it still beads up. Anything else I should be looking for?
I will etch the floor with muriatic acid. Will I hurt hurt anything if I spend the time and etch it twice so it’s good and roughed up?
Is it okay to put epoxy over something like DAP floor patch? (https://www.lowes.com/pd/DAP-32-oz-Gray-Patching-and-Spackling-Compound/3011841) There are a few chunks in the floor I need to fill.
Is there any reason I shouldn’t dump the epoxy out and spread it with a squeegee then back roll it like I’ve seen in many videos for higher end epoxies? I’ve noticed that many people using the rust pro said they ended up with quarter of half gallon left when they were done. Seems silly to me not to get that on the floor. Wasn’t sure if there was something about a system that’s not 100% solids which doing that would cause issues.
So for my prep I’ve got heavy duty degreaser and TSP to clean the floor. Should I do one particular one before the other?
I know one of the tests to see if the floor is free of oil and other matter is to drop water on it and see if it still beads up. Anything else I should be looking for?
I will etch the floor with muriatic acid. Will I hurt hurt anything if I spend the time and etch it twice so it’s good and roughed up?
Is it okay to put epoxy over something like DAP floor patch? (https://www.lowes.com/pd/DAP-32-oz-Gray-Patching-and-Spackling-Compound/3011841) There are a few chunks in the floor I need to fill.
Is there any reason I shouldn’t dump the epoxy out and spread it with a squeegee then back roll it like I’ve seen in many videos for higher end epoxies? I’ve noticed that many people using the rust pro said they ended up with quarter of half gallon left when they were done. Seems silly to me not to get that on the floor. Wasn’t sure if there was something about a system that’s not 100% solids which doing that would cause issues.