Keep
Well-known member
Okay I have "I think" come up with my final design, I am looking for input from folks that have installed and used this floor in the past.
My two main concerns were:
- The 2 cars that are stored/use this garage both have 700r4 transmissions. Anyone that has owned vehicles with this transmission know that they randomly like to spit fluid all over the floor. For this reason I went with the solid tiles under the vehicles.
- I need some drainage for the winter months, for snow blower storage/use
With those 2 things in mind here is my design:
(Top being the door side, though its pretty much a 18x20 rectangle minus some weird jut on the right rear)

Basically the outer 3 feet are free flow all the way around the garage, I have tools/bench along the entire left side of the garage to the tune of 2 foot. I thought of only using the free flow for the first 3 ft inside the door, but talk of sun expansion etc, lead me to just run it all the way around.
How do folks that work in the garage find dropping random screws in the free flow? Easy to retrieve or no?
My two main concerns were:
- The 2 cars that are stored/use this garage both have 700r4 transmissions. Anyone that has owned vehicles with this transmission know that they randomly like to spit fluid all over the floor. For this reason I went with the solid tiles under the vehicles.
- I need some drainage for the winter months, for snow blower storage/use
With those 2 things in mind here is my design:
(Top being the door side, though its pretty much a 18x20 rectangle minus some weird jut on the right rear)

Basically the outer 3 feet are free flow all the way around the garage, I have tools/bench along the entire left side of the garage to the tune of 2 foot. I thought of only using the free flow for the first 3 ft inside the door, but talk of sun expansion etc, lead me to just run it all the way around.
How do folks that work in the garage find dropping random screws in the free flow? Easy to retrieve or no?


