Looking for words of wisdom. I have to raise a detached garage or tear it down and build a new one above flood level.
Just bought a house on an acre this year. My goal is to finish one of my 3 outbuildings with double wall construction for music rehearsal with drums. I do not really need advice on soundproofing, I'm planning on double wall 'room inside room' construction with 2 leafs of 2 layers of 5/8" drywall and green glue. Neighbors are not to close. This construction should provide enough of STC (sound transmission loss).
I knew there was a chance this building would flood during heavy rain and hurricane Milton brought 4 to 6 inches of water in. I was planning to start construction next week BUT ain't no way I should start putting up layers of drywall I won't be able to reach after the next flash flood event.
As is it's:
- 24 x 26, 2x4 frame building.
- on slab
- plywood and vinyl exterior.
- not finished inside at all.
- metal roof
- 1 man door, 2 windows and one roll up car door.
- solar water panels that heat my pool are on the roof which I'll take to down for a lift
I've got a basic idea from YouTube videos and a thread on this forum of what it's gonna take.
What I do not know at the moment is if I go for a permit to raise the building onto a concrete pony wall is it I'll likely get turned down.
I'm thinking I should consult with a concrete contractor before contacting permitting for my county.
If you have any advice I'm listening. I've already read all thru SparkyNutz Wet Garage Raise and. watched his and other YouTube videos
Just bought a house on an acre this year. My goal is to finish one of my 3 outbuildings with double wall construction for music rehearsal with drums. I do not really need advice on soundproofing, I'm planning on double wall 'room inside room' construction with 2 leafs of 2 layers of 5/8" drywall and green glue. Neighbors are not to close. This construction should provide enough of STC (sound transmission loss).
I knew there was a chance this building would flood during heavy rain and hurricane Milton brought 4 to 6 inches of water in. I was planning to start construction next week BUT ain't no way I should start putting up layers of drywall I won't be able to reach after the next flash flood event.
As is it's:
- 24 x 26, 2x4 frame building.
- on slab
- plywood and vinyl exterior.
- not finished inside at all.
- metal roof
- 1 man door, 2 windows and one roll up car door.
- solar water panels that heat my pool are on the roof which I'll take to down for a lift
I've got a basic idea from YouTube videos and a thread on this forum of what it's gonna take.
What I do not know at the moment is if I go for a permit to raise the building onto a concrete pony wall is it I'll likely get turned down.
I'm thinking I should consult with a concrete contractor before contacting permitting for my county.
If you have any advice I'm listening. I've already read all thru SparkyNutz Wet Garage Raise and. watched his and other YouTube videos