Monkey Radio
Well-known member
I am getting ready for the pour of my slab. I am wondering if there is consideration for re-bar under a lift. I am concerned with when I go to roto hammer for the anchors. I am planing on doing two 4x4 squares. The re-bar is being placed on a2x2 grid. The lift is going to be Bendpac XPR-10a. Any help would greatly appreciated.
