Im in Arkansas. no permits or inspections required. I have brought in 22 dump truck loads of shale to flatten out my land (its on the top of a hill so the edge of my property drops off). The shop will be 30x50.
We spread the dirt using a dozer and Ive been compacying it for the past month or so by driving over it. Had a couple of good rains and it seems pretty compact.
So now I'm ready for footings and the slab. Im going to cut a footing and drop some rebar into it. My concrete guy (a friend too) said that I dont need a rebar grid across the slab and that I just need wire mesh on top of plastic (visqueen? sp?).
Will wire mesh be enough> how much is rebar if I wanted to put that down? If I wanted rebar, what is the grid? 24" or something else?
the slab with will poured at the same time as the footing.
We spread the dirt using a dozer and Ive been compacying it for the past month or so by driving over it. Had a couple of good rains and it seems pretty compact.
So now I'm ready for footings and the slab. Im going to cut a footing and drop some rebar into it. My concrete guy (a friend too) said that I dont need a rebar grid across the slab and that I just need wire mesh on top of plastic (visqueen? sp?).
Will wire mesh be enough> how much is rebar if I wanted to put that down? If I wanted rebar, what is the grid? 24" or something else?
the slab with will poured at the same time as the footing.