I have a 30x40 pole barn I am going to turn into a garage. Currently there is just a dirt floor that I need to dig out and prep for radiant floor install. I am having a little trouble with some of the details however.
I know I have to put compacted gravel down first, how much is really necessary 4,6,8 inches?
Correct me if I am wrong isnt is gravel,vapor barrier,2"formboard,wire,pex,4-5inch concrete?
I see alot of people post I need to put a 24inch vertical barrier around the interior perimeter. So 24in from where the top of the floor will be? If so, looks like im digging 24inchs of complete floor out correct? Or does the perimeter foam sit in the dirt?
I am not sure how deep the 6x6 post are set in the pole barn, or if they are on concrete or just buried but when it comes to putting a foam perimeter in what do I do around the posts? Just put foam around the contour of the post?
I know I have to put compacted gravel down first, how much is really necessary 4,6,8 inches?
Correct me if I am wrong isnt is gravel,vapor barrier,2"formboard,wire,pex,4-5inch concrete?
I see alot of people post I need to put a 24inch vertical barrier around the interior perimeter. So 24in from where the top of the floor will be? If so, looks like im digging 24inchs of complete floor out correct? Or does the perimeter foam sit in the dirt?
I am not sure how deep the 6x6 post are set in the pole barn, or if they are on concrete or just buried but when it comes to putting a foam perimeter in what do I do around the posts? Just put foam around the contour of the post?