I line the 100A panel and wiring for that capacity to future proof the shop. Maybe a welder one day, for example. 4 post lift uses relatively little power and compressors aren’t that bad for the typical 60 gallon. LED lights might be 40-50 watts for the typical 4000-5000 lumen 4’ model. You can run 30 of those on one 14 gauge 15 amp circuit.
I chose the 220V motor for my Bendpak HD9, but this size 4 post is also usually available with 110V motors that work fine. I’d have to look at the specs to see the draw, but the recommended breaker is probably conservative. My Campbell Hausfield 60 gallon 220V compressor might actually need the 30A breaker, at least on start up. I don’t run it for long, though that will occasionally change once I get my blast cabinet set up.
As for AL vs CU, I have always bought copper. But I have not done a 130’ run. More like half that and smaller wire for 50 or 60A. I don’t think this is a case where you would be saving $1000 but have not priced the wire. If it is a few hundred difference or less, I would go copper.