fifth
Well-known member
Received my plans back from the City, could someone explain what they are asking for?
My roof will have 1 foot of over hang off the side walls. The city is asking say "Underside of overhang must be 1 hour rated or 1/2" sag resistant gypsum board.
Most overhangs I see here in Phoenix I see the bare press board, what are the other options the covering the underside with drywall?
My roof will have 1 foot of over hang off the side walls. The city is asking say "Underside of overhang must be 1 hour rated or 1/2" sag resistant gypsum board.
Most overhangs I see here in Phoenix I see the bare press board, what are the other options the covering the underside with drywall?
