I'm in the planning stages of building a 10' X 12' Reloading room inside my existing 24 x 30 shop building.
Existing flooring is open concrete slab with various dirt, old paint, etc. stains.
I'll power was the floor ( And Let it dry thoroughly ) before I start the framing so that I have a clean surface to start with.
I'm planning on two work benches as well as space for a couple of shelving racks and a horizontal file cabinet that I have my dies, etc. stored in now.
Under the workbenches will get either cabinets or a couple of Roll-a-Way bottom tool boxes with the casters removed.
The floor area is only 120sqf so there's not going to be a lot of floor area exposed due to the work benches etc.
I'll have a couple of drafting type lab stools and the floor shouldn't have any heavy traffic or equipment, metal casters, jacks, or that type of wear & tear.
So - Now to the flooring:
Epoxy Coating or CVT ?
Existing flooring is open concrete slab with various dirt, old paint, etc. stains.
I'll power was the floor ( And Let it dry thoroughly ) before I start the framing so that I have a clean surface to start with.
I'm planning on two work benches as well as space for a couple of shelving racks and a horizontal file cabinet that I have my dies, etc. stored in now.
Under the workbenches will get either cabinets or a couple of Roll-a-Way bottom tool boxes with the casters removed.
The floor area is only 120sqf so there's not going to be a lot of floor area exposed due to the work benches etc.
I'll have a couple of drafting type lab stools and the floor shouldn't have any heavy traffic or equipment, metal casters, jacks, or that type of wear & tear.