I am building a pole barn. First time building one and I thought I had everything planned out perfectly. After they got the building framed up, I decided a 30x40 wasn’t big enough so I added a 13 foot lean to off the side of it. So I am wondering is it possible to remove the center 6x6 post? So it would be only 2 post out in the open instead of 3. I circled the post I would like to remove.
 

Attachments

  • BC6B1E41-CEF3-4630-9565-0CD2E9D3CE6E.jpg
    BC6B1E41-CEF3-4630-9565-0CD2E9D3CE6E.jpg
    75.2 KB · Views: 330
To avoid these ads, REGISTER NOW!

KenC

Well-known member
Joined
Dec 20, 2009
Messages
2,598
Location
oklahoma
If you are working from plans, check with the originator to see if there is a version with a large header over that area and no post. Depending on your snow loading it may be possible.
Don't just wing it though, get some assistance. I hate to say engineer, but your lumber yard should have the tables needed.
 

BD1

Well-known member
Joined
Mar 18, 2007
Messages
4,602
Location
north side
It's possible to add a steel I beam setting on top of the two existed posts.
Check with builder or local inspector for current codes.


Sent from my iPhone using Tapatalk
 
To avoid these ads, REGISTER NOW!

kbs2244

Well-known member
Joined
Nov 11, 2006
Messages
14,065
not without some heavy reworking of the plans
I like the "I" beam idea
 

Firebrick43

Well-known member
Joined
May 12, 2015
Messages
14,238
Location
West central Indiana
Pup, where are you located? Advise for Lake Superior area on Minnesota is much diffent than Alabama due to snow loads.


Did the put a cookie in the hole and set the pole on top? Or did the pour a pier 30 plus inches in diameter??? If the cookie I wouldn’t remove the post unless you excavate and pour a pier on the post on either side of the post you want to remove.
 

matt_i

Well-known member
Joined
Mar 14, 2008
Messages
10,758
Location
SE Michigan
Good time to start stocking up on nail-cutting sawzall blades.

With the existence of LVLs, an I-beam is going to be a far more expensive route in my opinion. Engineering of the connections to wood, fabrication of the connections back to wood, it all has to be lifted up in 1 shot vs 1-ply at a time with LVL and match perfectly or (?? take if back down and start cutting and rewelding). Maybe an LVL is currently priced x3 of the price I have in my mind and that changes things...but the ability to measure on site and cut with a circular saw and nail or screw with same construction tools already in-use is a big advantage.

You might save 6-8" in height with the steel.
 

Dustball

Well-known member
Joined
Jun 25, 2011
Messages
2,081
Location
Hudson, WI
As mentioned in this thread- removing a post or two would require the proper beam to transfer the roof load to the adjacent posts and the footings for the adjacent posts would need to be upsized to account for the increased load that each post is now taking on.
 