I got one wall of my tool cabinets all put together and height adjusted. On top of this will be a full length countertop.
Here is a shot of the feet. Notice that I welded on a 2" square piece of tubing to the bottom of the cabinet. I did this as I wanted more height.
http://www.garagejournal.com/forum/showthread.php?p=801212#post279
And last, I took all of the guts out of my lift control box and have them mounted behind and in the cabinet under the air conditioner. I have purchased a four button "crane hoist pendant control" (wired remote control) that I will wire up via a long coiled cord to control the lift.
I am waiting on HF to get in more of the tool cabinets to complete the opposite wall. Hopefully they will come in this wee so that I can get the countertops ordered.