Sorry if this isn't in the right section.
I have an old lift table that lowers too fast. I'd like to turn it into a welding table and replace the 3 phase electric lifting mechanism with a pneumatic setup I could run off my compressor. Anyone ever done this? Any reason to avoid going down this path? If I can't safely convert it to pneumatic I'll probably lift it to the height I want and weld it there permanently.
Sent from my Pixel 3 using Tapatalk
I have an old lift table that lowers too fast. I'd like to turn it into a welding table and replace the 3 phase electric lifting mechanism with a pneumatic setup I could run off my compressor. Anyone ever done this? Any reason to avoid going down this path? If I can't safely convert it to pneumatic I'll probably lift it to the height I want and weld it there permanently.
Sent from my Pixel 3 using Tapatalk


