I am new here but as I did a post with my details in the Introduce Yourself Here area (Hi from Central Iowa), I am going not to bore everyone with repeating everything.
My wife and I live on 6 acres in central Iowa. We are about 5 miles from the closest town and are on a paved road (which is a big thing here in Iowa). Our place is the building site of a farm that was split off from the farm land back in the 1980's. We have a great 1905 vintage farm house that we have redone and a number of out buildings, including a 40x60 machine shed where I have my existing shop. I am a car guy (Fords) and work mostly with vintage Mustangs and late model big Broncos (the ones based on the F-150). I also do some very amateur level road racing (I am in the middle of building a 1965 Mustang track car).
I retired a few months ago and as a retirement gift to myself, I am planning an upgrade to my shop. The existing shop is in the 40x60 machine shed. The machine shed is a very nice 2x6 wood framed building with a 12' ceiling height that dates back to about 1950 (the building runs north/south). The north 20x40 section of the building has has been walled off, with a ceiling put in and a concrete floor (this is where my existing shop is). The rest of the building (40x40) has a dirt floor with open framing and right now is used as storage (this is the way the building was set up when we got the place). The existing shop area is heated and cooled but has poor insulation and an old and leaky 16' sliding door (this 16' door is on the east side of the building, at the far north end). The building has plenty of power as a service upgrade with all the wiring ran underground was done a few years ago.
I have been planning the upgrade for a while and I have laid out a plan that I think will work. There will be no foot print change to the building, just changes to the inside. I am planning on using the dirt floored 40x40 south section for the new shop main area (this will be Phase One of the project). A new, insulated concrete floor will be poured and the walls and ceiling will be finshed off in white metal (R19 in the walls and at least R40 in the ceiling). The existing 16' wide sliding door that is on the south end of the building will be closed off and a new, most likely 12x10 overhead door and a man door will be cut into the east wall of the building at the south end of the side wall. The plans also include a two post lift. The shop will be heated and cooled (I will post in the HVAC area on the heating and cooling). The reason for the new overhead door opening is that I want a fairly large concrete pad outside the door opening to work on when it is nice out and to use when loading my car trailer. The ground just outside where the new door will be is pretty level and should not require too much dirt work (I already park my trailer just to the north of where the new pad will be). The ground just outside the existing south door drops off a lot and would require a lot of dirt work and it would be very hard to get a 24' trailer up to the pad to load and unload (my septic tank also gets in the way of access to the south door opening as it is just south of the machine shed and some of the require dirt work would most likely be right on top of it). Doing the south 40x40 upgrade first will allow the existing shop to stay operational until the new 40x40 space is complete.
Phase Two calls out converting the existing 20x40 shop area into a dedicated welding/fab/maching area (I am tired with having to do grinding and fab work right next to a car), an office/lounge with a bathroom and a storage area that I want to put a 4 post storage lift into.
I have attached some photos that show a bit of the lay of the land that may help understand some of my decisions on what I am doing and a pdf file that shows the existing shop layout and what I think the new building layout will look like. There are two different layouts options shown on the plans. The first and I what think may be the way I would go, shows the welding/fab/maching area open to the main shop. I will be in and out of this area a lot and heating and cooling the area can be done with the main shop HVAC system (I am thinking that being off to the side will keep the welding and grinding issues under control). The other option would be to wall off the welding/fab/maching area from the main shop. This option would require its own HVAC system and I am guessing a fairly large door to the main shop.
I am looking for opinions on a wall between the main shop and the welding/fab area and I am very open to opinions, comments and ideas on the rest of the upgrades.
Thanks for your time (sorry this got a bit long).
Kim Barron
My wife and I live on 6 acres in central Iowa. We are about 5 miles from the closest town and are on a paved road (which is a big thing here in Iowa). Our place is the building site of a farm that was split off from the farm land back in the 1980's. We have a great 1905 vintage farm house that we have redone and a number of out buildings, including a 40x60 machine shed where I have my existing shop. I am a car guy (Fords) and work mostly with vintage Mustangs and late model big Broncos (the ones based on the F-150). I also do some very amateur level road racing (I am in the middle of building a 1965 Mustang track car).
I retired a few months ago and as a retirement gift to myself, I am planning an upgrade to my shop. The existing shop is in the 40x60 machine shed. The machine shed is a very nice 2x6 wood framed building with a 12' ceiling height that dates back to about 1950 (the building runs north/south). The north 20x40 section of the building has has been walled off, with a ceiling put in and a concrete floor (this is where my existing shop is). The rest of the building (40x40) has a dirt floor with open framing and right now is used as storage (this is the way the building was set up when we got the place). The existing shop area is heated and cooled but has poor insulation and an old and leaky 16' sliding door (this 16' door is on the east side of the building, at the far north end). The building has plenty of power as a service upgrade with all the wiring ran underground was done a few years ago.
I have been planning the upgrade for a while and I have laid out a plan that I think will work. There will be no foot print change to the building, just changes to the inside. I am planning on using the dirt floored 40x40 south section for the new shop main area (this will be Phase One of the project). A new, insulated concrete floor will be poured and the walls and ceiling will be finshed off in white metal (R19 in the walls and at least R40 in the ceiling). The existing 16' wide sliding door that is on the south end of the building will be closed off and a new, most likely 12x10 overhead door and a man door will be cut into the east wall of the building at the south end of the side wall. The plans also include a two post lift. The shop will be heated and cooled (I will post in the HVAC area on the heating and cooling). The reason for the new overhead door opening is that I want a fairly large concrete pad outside the door opening to work on when it is nice out and to use when loading my car trailer. The ground just outside where the new door will be is pretty level and should not require too much dirt work (I already park my trailer just to the north of where the new pad will be). The ground just outside the existing south door drops off a lot and would require a lot of dirt work and it would be very hard to get a 24' trailer up to the pad to load and unload (my septic tank also gets in the way of access to the south door opening as it is just south of the machine shed and some of the require dirt work would most likely be right on top of it). Doing the south 40x40 upgrade first will allow the existing shop to stay operational until the new 40x40 space is complete.
Phase Two calls out converting the existing 20x40 shop area into a dedicated welding/fab/maching area (I am tired with having to do grinding and fab work right next to a car), an office/lounge with a bathroom and a storage area that I want to put a 4 post storage lift into.
I have attached some photos that show a bit of the lay of the land that may help understand some of my decisions on what I am doing and a pdf file that shows the existing shop layout and what I think the new building layout will look like. There are two different layouts options shown on the plans. The first and I what think may be the way I would go, shows the welding/fab/maching area open to the main shop. I will be in and out of this area a lot and heating and cooling the area can be done with the main shop HVAC system (I am thinking that being off to the side will keep the welding and grinding issues under control). The other option would be to wall off the welding/fab/maching area from the main shop. This option would require its own HVAC system and I am guessing a fairly large door to the main shop.
I am looking for opinions on a wall between the main shop and the welding/fab area and I am very open to opinions, comments and ideas on the rest of the upgrades.
Thanks for your time (sorry this got a bit long).
Kim Barron