slackdaddy1
Well-known member
Getting ready to sweat the mechanicals up and was looking for any input before I do. See attached sketch.
It is a closed system with 2 - 300' loops.
I placed the fill and purge connections as the highest point, so when pumping in the antifreeze solution it would be easier to purge the air.
I also located the boiler low on the wall so it is NOT the highest point of the system, so it will not run dry.
Did I miss anything?
Thanks for any comments, good or bad.
Slack
It is a closed system with 2 - 300' loops.
I placed the fill and purge connections as the highest point, so when pumping in the antifreeze solution it would be easier to purge the air.
I also located the boiler low on the wall so it is NOT the highest point of the system, so it will not run dry.
Did I miss anything?
Thanks for any comments, good or bad.
Slack