I got a helluva deal on a old reznor 120,000 btu I paid 20 bucks and I felt it work before removal. I hung it in the rafters of my 30x40x11, I realize its probably more heater then what I need. But anyhow I need to trench a gas pipe out to the shop. Its about a 100 foot run, would 3/4 be sufficient, or do I need 1 inch?
I tried to get 7 different plumbers out to give me bids on the job and in 2 months noone has showed up, so looks like im going to end up doing the job.
thanks in advance
I tried to get 7 different plumbers out to give me bids on the job and in 2 months noone has showed up, so looks like im going to end up doing the job.
thanks in advance