rustyjames
Well-known member
Hello fellow garage dweller's,
So I've got my heater just about ready for initial fire-up and I have a few questions to run by anyone who's been down this road.
It has a propane conversion kit installed, would the factory gas regulator setting (for natural gas) need to be checked with a manometer before startup?
The heater is piped with 1/2" black iron to the outside, about 25' in length and then to a 3/8" hose, 5' long to the regulator/tank. Do you think the reduction to 3/8" hose will be to restrictive, or should I go with 1/2" hose too?
Any advice or comments would be greatly appreciated.
So I've got my heater just about ready for initial fire-up and I have a few questions to run by anyone who's been down this road.
It has a propane conversion kit installed, would the factory gas regulator setting (for natural gas) need to be checked with a manometer before startup?
The heater is piped with 1/2" black iron to the outside, about 25' in length and then to a 3/8" hose, 5' long to the regulator/tank. Do you think the reduction to 3/8" hose will be to restrictive, or should I go with 1/2" hose too?
Any advice or comments would be greatly appreciated.