Should say Re-coat window. Thanks to Auto correct. I didn't catch it.
Any experience with putting rock solid clear coat over rock solid epoxy out of the 7 day window?
Due to factors well beyond my control, my garagemahal floor was put on hold right after I put the grey down. I also put a heavy chip application.
The floor project is actually two stages. The first section went down on 9 June. The next section on 23 June.
Rock solid tech support says scuff with 80 grit, and treat with MEK. way too many flakes in my opinion. I would be starting over.
Anyone ever put the clear on a month later?
link to folder of pics.
https://www.dropbox.com/sh/hohlqp5bbbis3ol/AAA8u6Vd2voBCiwaaNSZqXsGa?dl=0
Any experience with putting rock solid clear coat over rock solid epoxy out of the 7 day window?
Due to factors well beyond my control, my garagemahal floor was put on hold right after I put the grey down. I also put a heavy chip application.
The floor project is actually two stages. The first section went down on 9 June. The next section on 23 June.
Rock solid tech support says scuff with 80 grit, and treat with MEK. way too many flakes in my opinion. I would be starting over.
Anyone ever put the clear on a month later?
link to folder of pics.
https://www.dropbox.com/sh/hohlqp5bbbis3ol/AAA8u6Vd2voBCiwaaNSZqXsGa?dl=0
Last edited:
