Skiff Builder
Well-known member
Original plan was to pull the building jig/hull out on the driveway,roll it, pull it back in line ,than back into shop. Gravel driveway-this takes a bit of timber and time.. I have seen some complicated rigs/wooden rolling wheels/boom trucks/construction equipment and/or a lot of people used to accomplish this.
It's off season,no ones around and I don't have a fixed work sched I can count on, to set things up. Need to go simple/basic and probably solo on this.
Talking 20-3/4"ply
12- 1/2"ply
30 gal epoxy, 60 yds cloth, 2 gal epoxy paint, etc.
Minus cutoffs/waste.
^2200 lbs estimated.
It's off season,no ones around and I don't have a fixed work sched I can count on, to set things up. Need to go simple/basic and probably solo on this.
Talking 20-3/4"ply
12- 1/2"ply
30 gal epoxy, 60 yds cloth, 2 gal epoxy paint, etc.
Minus cutoffs/waste.
^2200 lbs estimated.


