longez
Well-known member
After finishing up our new home I'm finally back to building my 40x60 shop. I'm traveling on business this week, but today the builder set the roof trusses.He sent me these pictures, but something didn't look right - the pitch looked too low. When I called him he acknowledged they too were wondering about that and had just checked and found they were built at 4/12 instead of my 5/12 spec. Argggh! The 12' wide "wing" on the right side and over the entry was to be 3/12 and they indeed are correct. The truss company acknowledged they made a mistake, but have a plan to scab on additional material to make-up the 22-1/2" height deficiency.
Does this seem prudent, or should I tell them to forget it and build new trusses at 5/12? I'm so torqued off I can hardly see straight, but I'm sure it will get fixed one way or another.
Does this seem prudent, or should I tell them to forget it and build new trusses at 5/12? I'm so torqued off I can hardly see straight, but I'm sure it will get fixed one way or another.
