Finishing the creation of a new outbuilding.
Electrical service will be provided from an aerial line from my service provider. Here’s the question..
-starting the roof tomorrow
-the Rigid conduit that connects to the meter base that is going through the soffit and through the roof will have to be drilled at some point in the install.
Question... Would it be easier to have the rigid conduit installed thought the sheathing before ice/rain and the shingles? or does it not really matter?
Electrical service will be provided from an aerial line from my service provider. Here’s the question..
-starting the roof tomorrow
-the Rigid conduit that connects to the meter base that is going through the soffit and through the roof will have to be drilled at some point in the install.
Question... Would it be easier to have the rigid conduit installed thought the sheathing before ice/rain and the shingles? or does it not really matter?