Just wired my sub panel and one 20A GFCI rec. What's the best way to get around corners? Should I head up the stud to the attic and drop down, or drill through the corner 2x6's? I'm worried about structural integrity lost.
The inspector said since I'm planning on finishing the shop interior, romex ran horizontally at 4ft is ok, but if I dont sheetrock it, I have to run at 8'.