Hey guys I've been saving for this barn and just curious what the shell and concrete will run. I will do two dormers on one side vs the long window. Please include labor as im planning on only doing the inside (plumbing, electrical, insulation, etc). The trusses where the dormers are will be attic trusses for additional storage.
My house has brick so thinking brick about 4' up on three sides then metal or vinyl...haven't decided. I wont do any of the intricate work by the small overhead doors just basic opening. Shingled roof with 2' overhangs and I'm located in south east Michigan.
Thanks!