mobiledynamics
Well-known member
Just got a quote from a spark. I considered DIY.
Anyhow, just for rough #'s, for fellow GJ estimates, where do you think this should land
Pull cable from exisiting conduit from house that exits the house about 40 feet
Trench another 100 feet or so.
On the other end of the trench, dig, core, run cable into the core, link-seal core and parge foundation.
A wild guess would be a solid days work, 2 man. Maybe 1 1/2 day depending on how fast/slow these guys go.... What do you think this estimate might run.
I had a rough # in mind, but I was sorta shocked by how much their # came back
Anyhow, just for rough #'s, for fellow GJ estimates, where do you think this should land
Pull cable from exisiting conduit from house that exits the house about 40 feet
Trench another 100 feet or so.
On the other end of the trench, dig, core, run cable into the core, link-seal core and parge foundation.
A wild guess would be a solid days work, 2 man. Maybe 1 1/2 day depending on how fast/slow these guys go.... What do you think this estimate might run.
I had a rough # in mind, but I was sorta shocked by how much their # came back