wrench409
Well-known member
My original plan was to just run a single 240 circuit from the new sub panel across the attic area of the garage to power the compressor I have mounted outside the garage.
Afterthought now is to add a drop along the way for an outlet plug on a wall for future welding plans.
The question is - when I run the wire thru a junction box, do I cut the wire to make the branch to the wall plug and use wire nuts on the 10 gauge wire, then and continue the run to the compressor? Is this acceptable in NEC code? Wire nuts on 10 ga stranded? Seems like it isn't, but that's why I'm asking.
The circled area in the drawing below is what I want to add.
Thanks!
Afterthought now is to add a drop along the way for an outlet plug on a wall for future welding plans.
The question is - when I run the wire thru a junction box, do I cut the wire to make the branch to the wall plug and use wire nuts on the 10 gauge wire, then and continue the run to the compressor? Is this acceptable in NEC code? Wire nuts on 10 ga stranded? Seems like it isn't, but that's why I'm asking.
The circled area in the drawing below is what I want to add.
Thanks!