I am doing a 24x26 2 story new construction and I am to the point of where the slab will be poured this weekend I hope. Due to the second story I had to put in frost footings and a full foundation. I will be laying down the type 250 inside and out in preparation for the heated floor but first I want to run some things under that in the gravel if I can.
I plan on running electrical conduit and am wondering what type of air line can be buried or snaked through the conduit if needed.