mdsonofthesouth
Member
- Joined
- Jun 6, 2016
- Messages
- 9
As the title states I have forgotten how long you have to wait to grind the floor. I have a box and it states 8 hours to cure for sanding and painting, but as always Im skeptical. I will be patching the settlement cracks in the second garage tomorrow and would love to rent a grinder and be prepping the floor for my rock solid application asap. Its been since 2016 since I have used this product and I have totally forgotten how long. Thanks yall!
