A couple of years ago we built a home and I was able to move the footprint of the foundation to one side of the lot. This left me with 5’ on the short side and 15’ on the RV side. We had a metal gate installed and currently have a 22’ ski boat, 22’ class C motorhome and PWC on the side yard.
I would like to upgrade the class C to a 40’ to 45’ class A diesel pusher. The flatwork concrete I had laid down has fiber added to the mix but no rebar or metal mesh. The ground is about 6’ of hard clay soil. I doubt that we will have an issue with subsidence. Just curious what others with similar experience have had with concrete flatwork? I’m guessing it’s about 3.5 to 4 inches thick. Found a good deal on a 38’ motorhome that aim planning on checking out next weekend. Sure would be nice to upgrade. Current class c is getting around 4.5mpg’s. Should be pretty easy to double the fuel mileage with a 32,000 to 36,000 lb rig. https://www.garagejournal.com/forum/images/smilies/hellobye.gif
I would like to upgrade the class C to a 40’ to 45’ class A diesel pusher. The flatwork concrete I had laid down has fiber added to the mix but no rebar or metal mesh. The ground is about 6’ of hard clay soil. I doubt that we will have an issue with subsidence. Just curious what others with similar experience have had with concrete flatwork? I’m guessing it’s about 3.5 to 4 inches thick. Found a good deal on a 38’ motorhome that aim planning on checking out next weekend. Sure would be nice to upgrade. Current class c is getting around 4.5mpg’s. Should be pretty easy to double the fuel mileage with a 32,000 to 36,000 lb rig. https://www.garagejournal.com/forum/images/smilies/hellobye.gif
