Pics of your floor pour are fabulous! By looking at them I can tell it did indeed take a long time to get ready for the concrete! What a maticulous job it must have been to prep the subgrade, lay that supertough vapor barrier, trench drain, insulation board, rebar and pex tubing! All look top notch and installed straight and true. I have a couple questions from looking......your pex layout seems to not cover 100% of your floor, can you describe what you plan for the heating zones? Does some tubing apear larger in dia. than others? Also what brand trench drain did you use? Did you end up w/ any concrete in the trench? (A tip for those who install trench in the future is to cut strips of plywood to substitute for the grates just for the floor pour. Keeps the drains/grate free from splatter/spills) I am in the finishing stages of framing my garage and plan on getting to the rough plumbing this fall/winter and need small sections of trench drain. Last question....did your concrete contractor apply a curing compound?